Weidmuller UCVAR - Universal glavanically isolated signal con Bedienungsanleitung Seite 20

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 19
20
• Setup
Changing the setup
For setup mode, connect the security link and press the Å and ì
keys simultaneously. The software version will be displayed (flashing). If
you wish to continue, press within 10 s.
Note: If you remove the security link at any time during the setup
sequence, any changes you have made will be discarded and the
instrument will reset.
• Calibration
General
The UCV/AR is factory calibrated. Once calibrated it will operate with
any input or output format without recalibration.
Allow the instrument 15 minutes of powered operation (to reach a
stable temperature) before calibration.
During calibration allow a few seconds for signals to stabilise before
accepting the value.
Equipment requirements
• A suitable current/voltage source (must be able to generate 5, 10,
20, 50 mA and 5, 10, 20, 50 V to ±0.05 % or better accuracy)
• An accurate digital multimeter (accurate to 0.05 mV and ±0.1 μA)
Terminal Connections for input calibration
Calibration Stage Signal type Terminal
Current (mA) inputs
Milliamp source + 2
Milliamp source − 3
Voltage (V) inputs
Voltage source + 4
Voltage source − 3
Seitenansicht 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Kommentare zu diesen Handbüchern

Keine Kommentare